INSPECTION SYSTEM |
|
|
In order to guarantee quality mould and mould
meet customer's specification, at UnionMould, we have a strict QC control
system which can be carried out by our relative person from start to end
for each project. Normal inspection equipments such as
Co-ordinate Measure Machine, Projector, Pin gage, micrometer... have been
used. |
|
|
Main QC inspection procedure |
|
|
1. Before design confirmed, project
manager check, keep mould design with customer specification. |
|
2. After design confirmed, mould making
start, there is several key points for manufacture QC ; |
- mould base
inspection ; |
- mould block steel
hardness inspection ; |
- mould electrode
inspection ; |
- corresponding part
drawing, mould key dimension inspection ; |
- mould component
inspection before assembly ; |
- molding process
report and FAIR (first article inspection report) ; |
*** ( communicate till all dimensions meet drawing request
) *** |
- mould full
inspection pre-shippment ; |
- mould package
inspection ; |
|
3. After approve the mould, package the
mould and relative documents prepared ; |
- Mould package
inspection |
|
- Documents enclosed: |
1) Mould Inspection Check for Shipping |
2) Steel Certification |
3)
Heat treatment certification |
4) Latest Injection Test parameter Report |
5) 2d and 3d data of Mould
in CD |
6) Final Mold Layout |
7) The main electrode of the
moulds |
|
4. Release the mould, quality research
after sales . |